
18 Street Mall Exterior Upgrades, Brandon
March 31, 2022
18th Street Mall involved the removal of stucco from the building and water proofing. Exterior finish was a combination of stone and corrugated metal cladding
READ MORE
Equipment Shop
March 31, 2022
This equipment shop located in Kemnay,Mb was a 50’ x 50’ wood frame shop with concrete foundation. Exterior finishes consisted of various metal cladding.
READ MORE
MWSB 1595 City of Brandon Reservoir
March 31, 2022
City of Brandon Water Reservoir consisted of demolishing concrete roof and cutting down concrete walls. The re-construction was a structural steel roof, new insulation with interior liner panel for upper walls while the lower walls were sand blasted and...
READ MORE
Prairie Mountain Health Carberry Clinic Grading
April 1, 2021
Carberry Clinic Grading for Prairie Mountain Health project consisted of waterproofing existing foundation, new sidewalks and re-grading parking lot with asphalt for improved drainage.
READ MORE
Town of Redvers Ball Diamond Canteen
December 17, 2020
Town of Redvers, SK. Ball Diamond Canteen project featured a 1,664 sq. ft. seasonal building consisting of a canteen with kitchen, washrooms, and canopy area for community gatherings.
READ MORE
RM of Wallace-Woodworth – Harding and Kenton Genset Installation
December 17, 2020
RM of Wallace-Woodworth Genset Installation located at Harding and Kenton involved the construction of concrete foundations with 77 KW emergency stand by generators for the municipal water system.
READ MORE
Kola EMC Church Addition
December 17, 2020
Kola EMC Church Addition consisted of a 6,500 sq. ft. addition featuring a community hall, commercial kitchen, washrooms and entrance foyer.
READ MORE
Gambler First Nation Health Facility
December 18, 2015
Retro fit and upgrade to existing nursing station for Health Canada at Gambler First Nation.
READ MORE