MWSB 1595 City of Brandon Reservoir

Back to all Projects


Project Details

March 31, 2022

City of Brandon Water Reservoir consisted of demolishing concrete roof and cutting down concrete walls. The re-construction was a structural steel roof, new insulation with interior liner panel for upper walls while the lower walls were sand blasted and repainted.