Project Details
February 8, 2024
Virden, MB. The project consisted of removing the old existing bridge and constructing a new precast concrete bridge with a pedestrian walkway. Estimated cost of 1.5 million.
Virden, MB. The project consisted of removing the old existing bridge and constructing a new precast concrete bridge with a pedestrian walkway. Estimated cost of 1.5 million.