Browse through our Construction and Management Projects
Water and Sewer

Southwest Regional Water Co-op Water Well Mechanization & Booster Pumping Stations
September 11, 2017
The construction of two booster pumping stations, two well mechanizations and associated works for the Southwest Regional Water Co-op.
READ MORE
R.M. of Pipestone-Lift Station Works
March 2, 2017
Pipestone Lift Station consisting of piping and connections, underground works and control and the addition of a chemical feed building and associated works at the Town of Reston Lift Station.
READ MORE
R.M. of Whitehead Pressure Reducing and Meter Station
December 22, 2016
Construction of a pressure reducing and meter station and associated works for the Rural Municipality of Whitehead.
READ MORE
R.M. of Two Borders Pierson Sewage Pumping Station Building Replacement
December 1, 2016
Demolition of existing building and construction of new building while operation continues without interruption.
READ MORECivil

Kenton Bridge Removal and Culvert Installation
December 17, 2020
Kenton bridge removal and culvert installation involved the demolition of an existing bridge and installing two six foot diameter culverts.
READ MORE
Eastgate Business Park-Moosomin Saskatchewan Earthworks
June 1, 2017
Earthworks project involved organic material removal and replacement with organic clay. What has been a farm field for 130 years will become Moosomin’s newest development-Eastgate Business Park.
READ MORE
R.M. of Two Borders Gardiner Bridge Remediation
July 11, 2016
Structural rehabilitation consisting of the additional structural beams, stiffeners, new wood deck and W-Beam guardrail system.
READ MORECommercial

18 Street Mall Exterior Upgrades, Brandon
March 31, 2022
18th Street Mall involved the removal of stucco from the building and water proofing. Exterior finish was a combination of stone and corrugated metal cladding
READ MORE
Equipment Shop
March 31, 2022
This equipment shop located in Kemnay,Mb was a 50’ x 50’ wood frame shop with concrete foundation. Exterior finishes consisted of various metal cladding.
READ MORE
MWSB 1595 City of Brandon Reservoir
March 31, 2022
City of Brandon Water Reservoir consisted of demolishing concrete roof and cutting down concrete walls. The re-construction was a structural steel roof, new insulation with interior liner panel for upper walls while the lower walls were sand blasted and...
READ MORE
Prairie Mountain Health Carberry Clinic Grading
April 1, 2021
Carberry Clinic Grading for Prairie Mountain Health project consisted of waterproofing existing foundation, new sidewalks and re-grading parking lot with asphalt for improved drainage.
READ MORE
Town of Redvers Ball Diamond Canteen
December 17, 2020
Town of Redvers, SK. Ball Diamond Canteen project featured a 1,664 sq. ft. seasonal building consisting of a canteen with kitchen, washrooms, and canopy area for community gatherings.
READ MORE
RM of Wallace-Woodworth – Harding and Kenton Genset Installation
December 17, 2020
RM of Wallace-Woodworth Genset Installation located at Harding and Kenton involved the construction of concrete foundations with 77 KW emergency stand by generators for the municipal water system.
READ MORE
Kola EMC Church Addition
December 17, 2020
Kola EMC Church Addition consisted of a 6,500 sq. ft. addition featuring a community hall, commercial kitchen, washrooms and entrance foyer.
READ MORE
Gambler First Nation Health Facility
December 18, 2015
Retro fit and upgrade to existing nursing station for Health Canada at Gambler First Nation.
READ MORESpecialty

FPC’s Growing Space-Growing Dome
September 1, 2015
The Growing Dome geodesic greenhouse kits are unique, robust garden structures, made from wood struts and metal hubs and covered by polycarbonate glazing panels.
READ MORE